Full Bathroom Remodels on the Wasatch Front

A full remodel means the room comes apart. Tile off, tub or shower out, vanity out, toilet pulled, drywall down to the framing. That is not a dramatic choice, it is simply what it takes to get at plumbing, waterproofing, and ventilation at the same time. It is also the moment the house shows you what it has been hiding, which is why the first day of demo is more informative than any amount of planning that came before it.

From there the project runs in a fixed sequence, and the sequence is not negotiable. Rough work has to be inspected before it gets covered. Waterproofing has to be finished and verified before tile. Tile has to set before grout, and grout before fixtures. Every one of those steps has a wait built into it, and none of them can be run in parallel to save time. Understanding that up front is most of what makes the process tolerable.

What a down-to-the-studs bathroom remodel includes

  • Demolition and discovery — Everything comes out to the framing, and whatever the last remodel or the last slow leak left behind gets found. Rot, notched joists, and tired supply lines all surface here.
  • Plumbing rough-in — Supply lines, drains, and the valve body get set where the new layout wants them. Moving a shower drain or a toilet means working inside the floor structure, not just behind drywall.
  • Electrical and ventilation — Circuits, lighting, a receptacle where code wants one, and an exhaust fan sized for the room and ducted to the outside rather than dumped into the attic.
  • Waterproofing — The membrane or backer assembly goes in with every seam, corner, and drain connection sealed. This is the part that quietly determines whether the shower lasts.
  • Tile, stone, and surfaces — Floor, walls, shower, niche, and any curb or bench get laid out, cut, and set. Small rooms mean most pieces are cut by hand rather than run full.
  • Fixtures and finish — Vanity, toilet, shower door, trim, and hardware go in last, once the wet work has cured. Caulk lines and transitions get detailed at the very end.

The order the work has to happen in

  1. Walk the room and the house — A contractor should look at the room, the ceiling below it, and the attic above it before quoting. Stains, soft spots, and a fan duct that dead-ends tell you more than the bathroom does.
  2. Decide the layout before demo — Whether the toilet moves, whether the tub stays, and whether the floor changes height are framing and drain questions. Settle them on paper, because changing them mid-project is expensive in a way nothing else is.
  3. Rough in, then get it inspected — Plumbing, electrical, and any framing changes go in and get looked at while everything is still open. Nothing gets covered until it passes, and no honest contractor offers to skip that.
  4. Waterproof, tile, then finish — The wet assembly gets built and verified, tile goes on, grout follows, and fixtures come last. Each step waits on the one before it, which is why the back half feels slower than demo did.

What it costs

What moves the number on a full remodel is not the fixture catalog. It is whether the plumbing moves, how much tile there is and how detailed the layout gets, and what turns up once the walls are open. A shower drain relocated across joists, a floor that has to be recessed or built up, a soft subfloor discovered under the toilet flange, a fan that has been venting into the attic since the house was built. Those change scope. Fixture selection matters too, but it is the one variable you fully control, and it is usually the smallest of them.

Questions people ask

Can I stay in the house during a full remodel?

Most people do. What you cannot do is use that bathroom at any point during the project. If it is the only full bath in the house, arrange a shower elsewhere before demo starts rather than after. If you have a second bathroom, the disruption is dust, noise, and a hallway full of material rather than a real problem.

What usually gets found during demo?

Water damage around the tub or shower, a subfloor gone soft near the toilet, old or undersized supply lines, framing that was notched too aggressively for a drain, and a bath fan ducted into the attic instead of outside. Not every bathroom has all of it. Very few have none of it.

Do I have to move the plumbing?

No, and keeping fixtures where they are is the cleanest way to control scope. A new tub, a new vanity, and a rebuilt shower in the existing footprint avoid floor work entirely. Layout changes are worth doing when the room genuinely does not function, not simply for the sake of moving things around.

Should I replace the fan while the ceiling is open?

Yes. It is one of the smallest items on the list relative to what it prevents. Bathroom fans are routinely undersized for the room, and they are often ducted into the attic rather than through the roof or wall, which just relocates the moisture problem. With the drywall down, correcting both is straightforward.

Get Help With This

Takes about a minute. No obligation.

We will call you back at the number you give us. Your details go to us and to the provider we match you with, and nowhere else.

Also Available

Other services

Tub to Shower Conversion

The most common request we hear. The tub comes out, the shower grows, and the real work happens at the drain and in the floor framing below it. The tile you pick matters far less than that.

Learn more →

Tile & Waterproofing

Tile is the part you see and the least important part of the assembly. Behind it, a membrane or backer board is what keeps water out of the framing, and that layer is why some showers last decades and others fail quietly.

Learn more →

Walk-In & Accessible Baths

Low thresholds, solid blocking behind the walls for grab bars, and enough clear floor to turn around in. Done early and done right, none of it has to read as medical equipment bolted to a normal bathroom.

Learn more →

Powder Rooms & Small Baths

Small rooms are not cheap rooms. Every cut, every fitted piece, and every detail happens by hand in a space where nothing is standard, so the labor stays high even when the material list stays short.

Learn more →